Project Details
Project Location: Clifton, Manchester
Main Contractor: Robertson Construction
Scope of Works: Partitions, Ceilings, Plastering
Project Value: £270000
Contract Period: 4 Months
Project Description: Met-Excel was involved in the refurbishment and extension of Clifton PRU, a school in Clifton, Manchester. Our scope of work included the installation of ceilings, partitions, and plastering for both the refurbished areas and the new extension.
The extension was a modular structure, built off-site, which presented a key challenge in ensuring our installations complied with stringent fire safety regulations and were compatible with the new modular build. Navigating these regulations was crucial, as we needed to ensure that our work met the required standards for safety and functionality while integrating seamlessly with the extension.
Through careful planning and close collaboration with the main contractor, Met-Excel successfully navigated the regulatory landscape and delivered high-quality, compliant installations on time. Our ability to adapt to the specific requirements of the modular extension, while maintaining the quality of our work across the entire project, ensured the successful completion of the refurbishment and extension to the school.
The Clifton PRU project highlights Met-Excel’s expertise in handling complex projects with evolving requirements, delivering top-tier results that meet both safety standards and the client’s needs.