Project Details

Project Location: Colne, Lancashire

Main Contractor: Equans

Scope of Works: Partitions, Ceilings, Plastering, SFS

Project Value: £670000

Contract Period: 16 Months

Project Description: Met-Excel was proud to be involved in the redevelopment of Colne Primet Academy, a project that included both a large new build block for the school and extensive refurbishment work to the existing building. The refurbishment was carried out in stages over a 12-month period, presenting unique challenges in terms of coordination and timing. The task was to mobilise and complete different areas within tight time frames, which required careful planning and flexibility from our team.

Despite these challenges, Met-Excel successfully managed the phased refurbishment, delivering high-quality results on time. Our team also worked on the new build section of the project, where we provided partitions, ceilings, plastering, and SFS installation. This part of the project was delivered with precision, and the end result was a visually appealing, functional, and well-constructed new block that met the school's needs.

The work at Colne Primet Academy highlights Met-Excel's ability to handle both complex refurbishments and new builds. Our team’s dedication to quality and efficient project management ensured the success of the project, and the school now boasts a modern, upgraded environment that benefits both students and staff.